Brand Logo

Technical Services

AKVA Group Commissioning Framed as Spec Work

Service scope is written as acceptance criteria: hydraulic balance, biofilter start-up, dissolved oxygen alarms and operator handover checklists—not vague “full support” language.

Service Matrix With Reviewable Outputs

Each engagement maps a deliverable to a measurable farm parameter so agribusiness procurement and aquaculture project owners can compare proposals on equal footing. In 2023–2025 field packages, buyers typically request TAN load models, drum filter duty sheets and ROV camera inspection routes before purchase orders close.

Service package Primary output

Water & biomass model

Species, stocking density, feed rate, temperature and discharge limits collected before layout.

  • Flow target in m3/h per module
  • TAN load estimate for biofilter media
  • Oxygen cone duty sketch

Filtration train sizing

Mechanical filtration, protein skimmer, UV/ozone and VFD pump curves matched to feed load.

  • Drum filter mesh band recommendation
  • Skimmer air/water ratio notes
  • Service clearance diagram

Commissioning checks

Sensor thresholds, backup oxygen and cleaning access validated before livestock is stocked.

  • DO / pH / ORP alarm table
  • Bypass valve walkthrough
  • Shift handover form

Camera & ROV route plan

Underwater camera placement for feeding response, net inspection and mortality sweeps.

  • Fixed vs ROV coverage map
  • Clip retention window
  • Lighting / turbidity limits

Methodology Used on Spec Reviews

The sequence keeps CapEx discussions tied to water reuse, biosecurity and export compliance (GLOBALG.A.P. / BAP / HACCP evidence packs) rather than catalogue aesthetics.

  1. Lock the operating envelope

    Confirm species temperature band, maximum biomass, water exchange percentage and local effluent rules. Pond vs RAS trade-offs are documented when CapEx intensity must be justified against biosecurity gains.

  2. Size the treatment train

    Match drum filter, biofilter, protein skimmer, degassing and oxygenation to feed load. Fertigation or aquaponics side-streams are noted when nutrient export changes water chemistry.

  3. Prove the control points

    Commission sensors, VFD pumps and camera telemetry with written setpoints. Operators receive a one-page alarm matrix instead of a 40-slide deck.

  4. Close the loop after first harvest cycle

    Compare actual energy use, water reuse and mortality against the model. Update spare-parts kits and mesh/media change intervals with field numbers from the first grow-out.

Book a Parameter Review With AKVA Group

Bring tank counts, species and discharge limits. We return a service scope you can attach to an RFQ.