Brand Logo
Engineers reviewing RAS selection tables

Agronomy Specs

AKVA Group Selection Tables for Measurable Farms

Technical selection tables for irrigation, RAS, greenhouse climate context and machinery interfaces—written as acceptance criteria, not lifestyle claims.

Every AKVA Group shortlist starts with units buyers can audit: m3/h, mesh band, TAN load, DO setpoint, working width and moisture or climate targets when adjacent systems share water or power.

This page replaces vague capability brochures with comparison dimensions. Use it when preparing RFQs for recirculating aquaculture system modules, fertigation-linked loops, or equipment that must coexist with greenhouse and field machinery on the same site.

Selection Dimensions We Score

Hydraulic fit

Flow rate (m3/h), head, VFD pump duty and emergency bypass clearance against tank turnover goals.

Biological load

Biofilter media area, protein skimmer duty and DO bands matched to species and feed rate.

Monitoring integrity

Underwater camera / ROV coverage, telemetry points and clip retention for veterinary audits.

Working Tables by Domain

RAS module envelope

ParameterReference bandNotes for RFQ
Design flow20–200 m3/hState tank count and density
Drum filter mesh0.3–0.5 mmConfirm feed size and solids load
Water reuse target≥90%Depends on solids + biofilter balance
DO alarm latency<60 sSpecies-specific setpoints required

Irrigation / fertigation interface

ParameterReference bandNotes for RFQ
Transfer flowProject-specific m3/hKeep emitter clogging limits visible
Nutrient exportNitrate trend loggingNeeded for aquaponics loops
Controller handshakeModbus / APIAvoid dual conflicting setpoints

Greenhouse climate context

ParameterWhy it mattersHow we capture it
Shade screen scheduleAffects plant water demand linked to fish nutrient exportCollect as operating constraint, not product claim
Glazing typeGlass vs polycarbonate changes heat/light load on shared utilitiesDocument only when loops share power/water
Vent / HVAC peaksCompete with oxygen generation loadsPeak kW table in electrical appendix

Machinery interface (site utilities)

ParameterReference cueNotes for RFQ
PTO / genset interactionkW peaksOnly when farm power is shared with tractors or dryers
Working width / accessService aisle metersFilter skids need forklift paths
Moisture / grain adjacencyDust & hygieneKeep RAS halls sealed from grain dust where co-located

Operating Limits We Disclose Up Front

Review Progress Checkpoints

Parameter completenessTarget 100%

Species, volume, flow, TAN, discharge and camera needs filled before drawings.

Evidence pack readinessTarget 100%

ISO / CE / BAP documents attached when export buyers require them.

Commissioning checklistTarget 100%

Alarm matrix, bypass walkthrough and operator handover signed.

Standards Referenced in Spec Packs

GLOBALG.A.P. ISO 9001 BAP CE HACCP

Request a Spec Table Review

Send your draft RFQ fields. AKVA Group returns filled selection tables for irrigation, RAS, greenhouse context and machinery interfaces.